FAQs

There are public rights of way that run through the site and close to it. 

There are no plans to close any of these routes permanently, however, there may be a requirement for temporary closures or diversions. This will be established as the project progresses, and if it is needed then discussions with the County Council and other stakeholders will take place. 

Ecological surveys are underway, and measures will be put in place to protect and enhance local habitats. A minimum 10% biodiversity net gain will be delivered across the site.

Solar farms are generally quiet, but noise from inverters may occur. A Noise Impact Assessment will be prepared to ensure that any noise disturbance is minimal and does not impact on nearby residents. This will also take into account the noise generated during construction works.   

Construction will take about 12 months, with work happening Monday to Saturday during daytime hours.

Along with renewable energy, the community will receive direct benefits. These will be discussed at the appropriate time.

Initial research indicates that the site comprises Grade 3 soils (moderate quality). An Agricultural Land Classification Assessment will be prepared. 

The surrounding landscape, site topography, existing vegetation and proximity to a point of connection to the Grid make it well suited for solar development.